Brooklyn since 2014All five boroughsSame-day response during business hours

What is NYC FC § 5004.3.1?

Quick Answer

This section outlines the requirements for exhaust ventilation systems, including installation standards, ventilation rates, operational continuity, and emergency shutoff controls. It specifies design criteria based on the density of fumes or vapors and emphasizes proper air movement to prevent accumulation. Applies to building owners responsible for ventilation system compliance.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

5004.3.1 System requirements.

FC § 5004.3.1

Exhaust ventilation systems shall comply with the following requirements: 1. Installation shall be in accordance with the Mechanical Code.

2.Mechanical ventilation shall be at a rate of not less than 1 cubic foot per minute per square foot (0.00508 m3/s/m2) of floor area over the storage area.

3.Systems shall operate continuously unless alternative designs are approved.

4.A manual shutoff control shall be provided outside of the room in a position adjacent to the access door to the room or in an approved location. The switch shall be a break-glass or other approved type and shall be labeled: VENTILATION SYSTEM EMERGENCY SHUTOFF.

5.Exhaust ventilation shall be designed based on the density of the potential fumes or vapors released. For fumes or vapors that are heavier than air, exhaust shall be taken from a point within 12 inches (305 mm) of the floor. For fumes or vapors that are lighter than air, exhaust shall be taken from a point within 12 inches (305 mm) of the highest point of the room.

6.The design and location of exhaust and inlet air openings shall serve to provide air movement across all portions of the floor and room to prevent the accumulation of vapors.

Common Questions

Our team

Meet the people you will work with

Free case review

Have a matter that touches § 5004.3.1?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters