2703.10.4.4.1 Sprinkler head locations.
FC § 2703.10.4.4.1
Sprinkler heads shall be installed at 12-foot (3658 mm) intervals in horizontal ducts and at changes in direction. In vertical runs, sprinkler heads shall be installed at the top and at alternate floor levels.











