What is NYC FC § 2404.3.2.2?

Quick Answer

This section mandates that spray booths must be installed with a clear space of at least 3 feet on all sides for maintenance and cleaning. An exception allows for reduced space near certain fire-resistant structures. Applies to operators of facilities using spray booths.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

2404.3.2.2 Clear space.

FC § 2404.3.2.2

Spray booths shall be installed so that all parts of the booth are readily accessible for cleaning and other maintenance. A clear space of not less than 3 feet (914 mm) shall be maintained on all sides of the spray booth. Exception: A clear space of less than 3 feet (914 mm) may be maintained from an interior partition, wall or floor/ceiling assembly with a fire-resistance-rating of not less than 1 hour, or an exterior wall or roof assembly of a noncombustible wall or roof.

Common Questions

Our team

Meet the people you will work with

TI

Tiffany Irizarry

Legal Coordinator

OATH / DOB
TI

Tiffany Irizarry

Legal Coordinator

OATH / DOB

Free case review

Have a matter that touches § 2404.3.2.2?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

reception@nacmiaslaw.com

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters