2306.9.6 Periodic tank and piping test.
FC § 2306.9.6
Any existing underground single-walled liquid motor fuel storage tank previously approved by the department or any existing underground tank that is not provided with a leak detection system meeting the requirements of FC 2306.7.7 shall be precision tested at least once every 5 years.











