What is NYC FC § 2306.6.2.2?

Quick Answer

This section mandates that the fill-pipe for aboveground tanks includes a direct connection to the cargo tank's fuel-delivery hose to prevent exposure of liquid motor fuel to open air during filling. It also requires specific safety equipment per OSHA regulations. Applies to operators of aboveground fuel tanks.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

2306.6.2.2 Fill-pipe connections.

FC § 2306.6.2.2

The fill-pipe for aboveground tanks shall be provided with a means for making a direct connection to the cargo tank's fuel-delivery hose so that liquid motor fuel is not exposed to the open air during the filling operation. Operator safety equipment for the filling operation shall be provided in accordance with OSHA regulations. Where any portion of the fill-pipe exterior to the tank extends below the level of the top of the tank, a check valve, a dry break coupling and a quick closing valve shall be installed at the fill connection. Tank fill connections from a remote location are prohibited.

Common Questions

Our team

Meet the people you will work with

TI

Tiffany Irizarry

Legal Coordinator

OATH / DOB
TI

Tiffany Irizarry

Legal Coordinator

OATH / DOB

Free case review

Have a matter that touches § 2306.6.2.2?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

reception@nacmiaslaw.com

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters