Brooklyn since 2014All five boroughsSame-day response during business hours

What is NYC BC § 415.11.6.3?

Quick Answer

This section mandates the installation of excess flow control for pressurized piping carrying high hazard materials (HPM) gases or liquids over 15 psig. The control must be positioned within the relevant storage or gas room or as close to the bulk source as feasible. Applies to building owners managing HPM systems.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

415.11.6.3 Excess flow control.

BC § 415.11.6.3

Where HPM gases or liquids are carried in pressurized piping above 15 pounds per square inch gauge (psig) (103.4 kPa), excess flow control shall be provided. Where the piping originates from within a liquid storage room, HPM room or gas room, the excess flow control shall be located within the liquid storage room, HPM room or gas room. Where the piping originates from a bulk source, the excess flow control shall be located as close to the bulk source as practical.

Common Questions

Our team

Meet the people you will work with

Free case review

Have a matter that touches § 415.11.6.3?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters