What is NYC BC § 415.11.1.5?

Quick Answer

This section outlines requirements for enclosing elevator hoistways, vent shafts, and other openings through floors as specified in Sections 712 and 713. It restricts mechanical, duct, and piping penetrations to a maximum of two floors and mandates sealing around penetrations to limit air movement. Applies to building owners managing fabrication areas.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

415.11.1.5 Shafts and openings through floors.

BC § 415.11.1.5

Elevator hoistways, vent shafts and other openings through floors shall be enclosed where required by Sections 712 and 713. Mechanical, duct and piping penetrations within a fabrication area shall not extend through more than two floors. The annular space around penetrations for cables, cable trays, tubing, piping, conduit or ducts shall be sealed at the floor level to restrict the movement of air. The fabrication area, including the areas through which the ductwork and piping extend, shall be considered a single conditioned environment.

Common Questions

Our team

Meet the people you will work with

Free case review

Have a matter that touches § 415.11.1.5?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters