What is NYC BC § 403.3.3?

Quick Answer

This section mandates that high-rise buildings in Seismic Design Categories C or D, and those with occupied floors above 500 feet, provide a secondary on-site water supply matching the sprinkler demand. The supply must last at least 30 minutes based on occupancy hazard classification. Applies to building owners of high-rise structures.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

403.3.3 Secondary on-site water supply.

BC § 403.3.3

A secondary on-site water supply equal to the hydraulically calculated sprinkler demand, including the hose stream requirement, shall be provided for high-rise buildings in Seismic Design Category C or D as determined by this code, and in any high-rise building with occupied floors located more than 500 feet (152 m) above the lowest level of fire department vehicle access. The secondary on-site water supply shall have a duration of not less than 30 minutes as determined by the occupancy hazard classification in accordance with NFPA 13 as modified by Appendix Q of this code.

Common Questions

Our team

Meet the people you will work with

Free case review

Have a matter that touches § 403.3.3?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters