What is NYC BC § 3318.4?

Quick Answer

This section outlines the construction requirements for personnel hoists and their components, mandating compliance with manufacturer specifications, applicable codes, and rules set by the commissioner. It requires an inspection report upon completion, verifying adherence to design drawings and specifications. Applies to building owners involved in hoist installation.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

3318.4 Construction.

BC § 3318.4

Personnel hoists and their components shall be constructed in compliance with the manufacturer's specifications, this code, and rules promulgated by the commissioner. If there is a discrepancy, the stricter requirement shall be met. Upon completion of the installation of the hoisting equipment and/or its runback structure, an inspection report verifying that the hoist has been installed in accordance with the design drawings, construction documents and specifications shall be prepared by the designer, installer or third party designated by both the designer and installer and acceptable to the commissioner.

Common Questions

Our team

Meet the people you will work with

Free case review

Have a matter that touches § 3318.4?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters