What is NYC BC § 3314.8?

Quick Answer

This section mandates that scaffold platforms have guardrail systems and debris netting, with specific exceptions outlined for installation, proximity to buildings, and scaffold height. The Department of Buildings enforces these requirements. Applies to building owners and contractors utilizing scaffolding in construction activities.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

3314.8 Guardrail system and debris netting.

BC § 3314.8

The open sides and ends of scaffold platforms shall be provided with a guardrail system that meets the requirements of Section 3314.8.1 and debris netting that meets the requirements of Section 3314.8.2. Exceptions: 1. A guardrail system and debris netting are not required while the scaffold is being installed or removed but shall be in place before the scaffold is used.

2.A guardrail system and debris netting is not required along the edge of a scaffold facing a building or structure, provided the distance from the edge of the scaffold platform to the face of the building or structure is: 2.1. For an outrigger scaffold, 3 inches (76 mm) or less; 2.2. For a scaffold used in conjunction with plastering and lathing operations, 18 inches (457 mm) or less; or 2.3. For all other scaffolds, 14 inches (356 mm) or less.

3.Debris netting is not required for a scaffold where the scaffold is set back from all adjoining property and areas that remain open to the public at a distance that is equal to or greater than half the height of scaffold, except where the scaffold is installed to provide an alternative to demolition safety zones, sidewalk sheds, safety netting, or adjoining property protection in accordance with Sections 3306, 3307, 3308, 3309, or the scaffold is installed at the edge of an unenclosed perimeter in accordance with Section 3314.9.4.

4.Debris netting is not required for a scaffold that does not require a design in accordance with Section 3314.3, except where the scaffold is installed to provide an alternative to demolition safety zones, sidewalk sheds, safety netting, or adjoining property protection in accordance with Sections 3306, 3307, 3308, or 3309, or the scaffold is installed at the edge of an unenclosed perimeter in accordance with Section 3314.9.4.

5.A guardrail system and debris netting is not required for a supported scaffold whose topmost platform is 6 feet (1829 mm) or less above the level of the ground or floor, except as otherwise required by Section 3314.9.4.

Common Questions

Our team

Meet the people you will work with

Free case review

Have a matter that touches § 3314.8?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters