Brooklyn since 2014All five boroughsSame-day response during business hours

What is NYC BC § 3314.10.1?

Quick Answer

This section mandates that suspended scaffolds be installed so that their suspension elements remain vertical or parallel to the wall at all times. An exception exists if design drawings prepared by a registered design professional allow for different configurations, provided they are based on a thorough investigation of the support structure. Applies to building owners utilizing suspended scaffolds for construction or maintenance work.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

3314.10.1 Suspended elements to be kept vertical and parallel.

BC § 3314.10.1

Suspended scaffolds shall be installed and used in such a manner that the ropes or similar suspension elements are vertical and/or in a plane parallel to the wall at all times. Exception: Ropes or similar suspension elements do not have to be vertical and/or in a plane parallel to the wall provided such occurs in accordance with design drawings prepared by a registered design professional. Such design drawings shall be based on an investigation of the support surface/structure (e.g. roof, parapet) and anchorage of the scaffold conducted by such registered design professional. A signed, sealed, and dated report prepared by the registered design professional documenting such investigation shall accompany the design drawings.

Common Questions

Our team

Meet the people you will work with

Free case review

Have a matter that touches § 3314.10.1?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters