What is NYC BC § 3308.6.1.2?

Quick Answer

This section mandates the installation of horizontal safety netting during the demolition of exterior walls or roofs at heights exceeding six stories or 75 feet. The netting must be positioned no more than two stories or 30 feet below the demolition level. Applies to building owners involved in high-rise demolitions.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

3308.6.1.2 During demolition.

BC § 3308.6.1.2

When the demolition of the exterior walls or the roof of a building occurs at a height greater than six stories or 75 feet (22 860 mm), whichever is less, horizontal safety netting shall be provided at a level not more than two stories or 30 feet (9144 mm), whichever is less, below the story from which the exterior walls and roof are being removed. Exception: Demolition of exterior walls only for the purposes of the alteration, maintenance, or repair of a facade shall be in accordance with Section 3308.6.1.3.

Common Questions

Our team

Meet the people you will work with

Free case review

Have a matter that touches § 3308.6.1.2?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters