What is NYC BC § 3307.6.4.6?

Quick Answer

This section mandates the construction of a vertical parapet on sidewalk sheds, specifying height and material requirements. The parapet must be securely attached and can be temporarily removed for material handling. Exceptions apply based on proximity to buildings and specific demolition scenarios. Applies to building owners responsible for sidewalk shed compliance.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

3307.6.4.6 Parapet.

BC § 3307.6.4.6

A vertical parapet at least 3 feet 6 inches (1067 mm) high, but no more than 4 feet (1219 mm) high, as measured from the deck of the sidewalk shed, shall be constructed along all edges of the sidewalk shed. Such parapet shall consist of galvanized wire screen not less than No. 16 steel wire gauge with a 1/2 inch (13 mm) mesh. Parapets shall be securely attached to the shed with braced uprights. Parapet braces shall be made of metal. Temporary removal of a portion of the parapet is permitted for the handling of material, provided the parapet is immediately restored at the end of the handling operation. Exceptions: 1. A parapet is not required along the edge of the sidewalk shed that abuts a building or structure.

2.A parapet is not required along the edge of a sidewalk shed that abuts an area that is closed to the public.

3.Where the sidewalk shed is installed in conjunction with the full or partial demolition of a building or structure, other than work limited to a facade project, the parapet shall consist of plywood or other equivalent solid material.

4.Where a sign, including a parapet information panel, is installed on a sidewalk shed, the parapet backing for the sign may consist of plywood or other equivalent solid material.

Common Questions

Our team

Meet the people you will work with

Free case review

Have a matter that touches § 3307.6.4.6?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters