What is NYC BC § 3306.9.11.5?

Quick Answer

This section mandates that party walls be examined by a qualified individual appointed by the permit holder to evaluate their condition before any load is placed upon them. If the wall is deemed inadequate, no materials may be stored until it is properly shored or strengthened by a registered design professional. Applies to building owners responsible for structural integrity.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

3306.9.11.5 Examination of party walls.

BC § 3306.9.11.5

Party walls shall be carefully examined by a competent person designated by the permit holder to ascertain the condition and adequacy of the party wall prior to the placement of any material that will impose a load upon such party wall. If the party wall is found to be in poor condition or inadequate to support the stored material, no material shall be deposited on the floor until the party wall is shored or otherwise strengthened as determined by a registered design professional to safely support such material.

Common Questions

Our team

Meet the people you will work with

Free case review

Have a matter that touches § 3306.9.11.5?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters