3306.10.1 Evaluation of fill on adjoining foundations.
BC § 3306.10.1
Where the installation of fill will impart a load on an adjoining foundation, a registered design professional shall evaluate the foundation prior to the placement of the fill. If necessary, sheeting, shoring, or bracing shall be provided as indicated by the registered design professional.













