3305.3.6.8 Reshoring Schedule.
BC § 3305.3.6.8
A signed and sealed reshoring schedule shall be provided and maintained at the construction site whenever reshoring is employed. Exception: A separate reshoring schedule is not required when the required reshoring information is covered on the approved construction documents prepared by the applicant of record.