What is NYC BC § 3305.3.6.5?

Quick Answer

This section outlines the requirements for reshoring flat-slab construction, specifying that formwork cannot be removed until the concrete has gained adequate strength or temporary supports are installed. Reshores must be maintained until the concrete can support the anticipated loads. Applies to construction professionals involved in flat-slab projects.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

3305.3.6.5 Reshoring flat slabs.

BC § 3305.3.6.5

Where reshoring of flat-slab construction is required, the formwork cannot be stripped until the concrete has acquired sufficient strength to safely support its weight and the load thereon, or temporary preshores are provided supporting the slab at intervals of no more than 8 feet (2438 mm) on center to be replaced by reshores prior to placing concrete on the floor above. Reshores must be installed and remain in place until the concrete reaches full or sufficient strength to sustain the superimposed loads to which the concrete will be subjected.

Common Questions

Our team

Meet the people you will work with

Free case review

Talk to an attorney before you act on NYC code.

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters