What is NYC BC § 3305.2.8?

Quick Answer

This section mandates the timely installation of permanent floors in tiered buildings during the erection of structural steel members. It stipulates a maximum of eight stories or 120 feet between the working deck and the highest permanent floor. Applies to construction professionals involved in tiered building projects.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

3305.2.8 Permanent flooring and steel erection in tiered buildings.

BC § 3305.2.8

The permanent floors of such buildings or other structures shall be installed as soon as possible as the erection of structural steel members progresses. In no case shall there be more than eight stories, floors or equivalent levels or 120 feet (36 576 mm), whichever is less, between the working deck and the uppermost permanent floor. Exception: Where otherwise designed, in accordance with the approved construction documents, by the registered design professional of record.

Common Questions

Our team

Meet the people you will work with

Free case review

Have a matter that touches § 3305.2.8?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters