3303.6.2 Shield space and decking.
BC § 3303.6.2
Any gap between the shield and the perimeter of the opening in the floor under construction and also between the shield and the perimeter of the opening in the heating floor shall be decked over with 2-inch (51 mm) or heavier planking covered with plywood or sheet metal so as to make the decking smoke tight. At the termination of the ladders, the opening in the floor shall be covered completely with 2-inch (51 mm) planking or other material of equivalent strength.













