Brooklyn since 2014All five boroughsSame-day response during business hours

What is NYC BC § 2308.4.4.1?

Quick Answer

This section outlines the construction requirements for openings in floor diaphragms located in Seismic Design Categories B, C, and D. It specifies the materials, dimensions, and attachment methods for metal ties and blocking. Applies to building owners involved in the design and construction of structures in seismic zones.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

2308.4.4.1 Openings in floor diaphragms in Seismic Design Categories B, C, and D.

BC § 2308.4.4.1

Openings in horizontal diaphragms in Seismic Design Categories B, C, and D with a dimension that is greater than 4 feet (1219 mm) shall be constructed with metal ties and blocking in accordance with this section and Figure 2308.4.4.1(1). Metal ties shall be not less than 0.058 inch (1.47 mm) (16 galvanized gage) in thickness by 1 1/2 inches (38 mm) in width and shall have a yield stress not less than 33,000 psi (227 Mpa). Blocking shall extend not less than the dimension of the opening in the direction of the tie and blocking. Ties shall be attached to blocking in accordance with the manufacturer's instructions but with not less than eight 16d common nails on each side of the header-joist intersection. Openings in floor diaphragms in Seismic Design Category D shall not have any dimension exceeding 50 percent of the distance between braced wall lines or an area greater than 25 percent of the area between orthogonal pairs of braced wall lines (see Figure 2308.4.4.1(2)); or the portion of the structure containing the opening shall be designed in accordance with accepted engineering practice to resist the forces specified in Chapter 16, to the extent such irregular opening affects the performance of the conventional framing system. Figure 2308.4.4.1(1)Openings in Floor and Roof Diaphragms Figure 2308.4.4.1(2)Opening Limitations for Floor and Roof Diaphragms

Common Questions

Our team

Meet the people you will work with

Free case review

Have a matter that touches § 2308.4.4.1?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters