What is NYC BC § 2303.4.2?

Quick Answer

This section requires truss manufacturers to provide a truss placement diagram that indicates the location of each designated truss and references the corresponding design drawing. The diagram must be included in the truss submittal package and with the truss shipment to the job site. Applies to building projects utilizing trusses.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

2303.4.2 Truss placement diagram.

BC § 2303.4.2

The truss manufacturer shall provide a truss placement diagram that identifies the proposed location for each individually designated truss and references the corresponding truss design drawing. The truss placement diagram shall be provided as part of the truss submittal package, and with the shipment of trusses delivered to the job site. Truss placement diagrams that serve only as a guide for installation and do not deviate from the the Truss Designer's approved construction drawings shall not be required to bear the seal or signature of the truss designer.

Common Questions

Our team

Meet the people you will work with

Free case review

Have a matter that touches § 2303.4.2?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters