What is NYC BC § 2114.2.3?

Quick Answer

This section mandates that each column, pier, and wall be vertically tied from the lowest to the highest level, with reinforcement terminated in a horizontal tie or foundation. It specifies the requirements for ties around openings in bearing walls and control joints. Applies to building owners involved in construction and structural integrity.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

2114.2.3 Vertical ties.

BC § 2114.2.3

Each column, pier and wall shall be vertically tied continuously from its lowest to highest level. The vertical reinforcement shall be terminated in a horizontal tie or foundation or their equivalent. Where openings in bearing walls greater than 24 inches (610 mm) in height occur, ties shall be provided at each side of the opening that extend and are anchored in the masonry above and below the opening. Vertical ties shall be placed on both sides of control joints in bearing walls.

Common Questions

Our team

Meet the people you will work with

Free case review

Have a matter that touches § 2114.2.3?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters