What is NYC BC § 1912.2.2?

Quick Answer

This section mandates the installation of continuous peripheral ties at each floor and roof level, ensuring structural integrity. The ties must be positioned within perimeter beams or walls, or within 4 feet of the slab edge when such beams or walls are absent. Applies to building owners involved in structural reinforcement.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

1912.2.2 Peripheral ties.

BC § 1912.2.2

At each floor and roof level, reinforcement forming a continuous peripheral tie shall be provided. Peripheral ties shall be located within perimeter beams or walls, where they occur, or within 4 feet (1219 mm) of the edge of slab, where perimeter beams or walls do not occur. Continuous tie reinforcement shall be equal to half of the bottom reinforcement within the edge or edge strip for two-way slabs but not less than two bars.

Common Questions

Our team

Meet the people you will work with

Free case review

Have a matter that touches § 1912.2.2?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters