What is NYC BC § 1905.6.2.2?

Quick Answer

This section outlines the minimum number of strength tests required for concrete used in construction projects. If the total volume of concrete results in fewer than five tests as per Section 1905.6.2.1, testing must be conducted from at least five randomly selected batches or from each batch if fewer than five are available. Applies to construction projects involving concrete.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

1905.6.2.2 Minimum number.

BC § 1905.6.2.2

On a given project, if the total volume of concrete is such that the frequency of testing required by Section 1905.6.2.1 would provide less than five strength tests for a given class of concrete, tests shall be made from at least five randomly selected batches or from each batch if fewer than five batches are used.

Common Questions

Our team

Meet the people you will work with

Free case review

Have a matter that touches § 1905.6.2.2?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters