What is NYC BC § 1905.3.5?

Quick Answer

This section permits certain field changes to concrete proportions during construction without requiring additional trial mixtures or strength test records, provided specific documentation and conditions are met. Applies to concrete producers and contractors involved in construction projects.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

1905.3.5 Field changes to concrete proportions.

BC § 1905.3.5

Based on test data and observations during the course of construction, the following changes described in Sections 1905.3.5.1 and 1905.3.5.2 are permitted without requiring additional trial mixtures or field strength test records, provided: 1. There are no changes to the type and source of materials described in Sections 1905.3.3 and 1905.3.4, except as permitted in Sections 1905.3.5.1 and 1905.3.5.2; 2. Documentation of these changes are maintained by the concrete producer and the concrete contractor; 3. The changes described in Section 1905.3.5 cannot be used for the submission of an initial mix design to demonstrate that a previously prepared mix design meets strength or air content requirements that differ from the required concrete properties without new field strength test records or new trial mix designs; 4. Where required in Section 1905.3.5, documentation of these changes shall be submitted for acceptance to the registered design professional of record for the structural design by the concrete producer prior to use; 5. Copies of the revised mixtures shall be maintained at the construction site and provided to the licensed concrete testing laboratory performing the acceptance testing of concrete in accordance with Item 4 of Table 1705.3 of this code; and 6. The documentation required by Items 2 and 5 above shall be made available to the commissioner upon request.

Common Questions

Our team

Meet the people you will work with

Free case review

Have a matter that touches § 1905.3.5?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters