Brooklyn since 2014All five boroughsSame-day response during business hours

What is NYC BC § 1905.2.4?

Quick Answer

This section outlines the requirement for a thermal control plan for high-strength mass concrete, specifically for concrete with a strength of 8,000 psi or greater and a minimum dimension of 36 inches. The plan must comply with ACI 301 and be approved by the registered design professional. Applies to contractors involved in construction projects utilizing high-strength mass concrete.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

1905.2.4 Mass concrete.

BC § 1905.2.4

For areas of high-strength mass concrete, including but not limited to, 8,000 psi (55 158 kPa) or greater and the least dimension being equal to or greater than 36 inches (914 mm), as indicated on the construction documents, a thermal control plan complying with ACI 301, Section 8.1 and acceptable to the registered design professional of record shall be submitted by the contractor.

Common Questions

Our team

Meet the people you will work with

Free case review

Talk to an attorney before you act on NYC code.

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters