What is NYC BC § 1818.4.1?

Quick Answer

This section outlines the responsibilities of the geotechnical peer reviewer in evaluating plans and specifications for compliance with foundation design provisions. The reviewer must confirm subsurface investigations, geotechnical reports, foundation capacities, and address potential impacts on adjacent structures. Applies to building owners involved in foundation design and construction.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

1818.4.1 Scope.

BC § 1818.4.1

The geotechnical peer reviewer shall review the plans and specifications submitted with the permit application for general compliance with the foundation design provisions of this code. The reviewing engineer shall perform the following tasks at a minimum: 1. Confirm that the subsurface investigation meets the requirements of this code.

2.Confirm that the geotechnical report and supplemental reports, including foundation recommendations and testing, meet the requirements of this code.

3.Provide independent check on foundation capacities. This check must include the structural and geotechnical capacity of the foundation element, if not covered by the structural peer review.

4.Where uplift resistance is required, provide independent check on prestressed anchor or pile design.

5.Perform independent settlement calculations.

6.Confirm the design assumptions made by the geotechnical and structural engineers pertaining to the soil-foundation structure interaction are coordinated and consistent.

7.Confirm that potential impacts on adjacent structures due to foundation construction have been addressed in accordance with this code.

8.Review seismic analysis including any site-specific analysis, associated mitigation methods, and analyses pertaining to liquefaction for conformance with codes. (Am. L.L. 2023/077, 6/11/2023, eff. 6/11/2023) Editor's note: For related unconsolidated provisions, see Appendix A at L.L. 2023/077.

Common Questions

Our team

Meet the people you will work with

Free case review

Have a matter that touches § 1818.4.1?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters