Brooklyn since 2014All five boroughsSame-day response during business hours

What is NYC BC § 1817.6?

Quick Answer

This section outlines the minimum requirements for construction documents related to the support of adjacent buildings. It specifies necessary information such as foundation types, elevations, monitoring criteria, and detailed designs for support methods. Applies to construction professionals involved in building support projects.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

1817.6 Minimum requirements for construction documents.

BC § 1817.6

Construction documents for methods of support of adjacent buildings shall include the following information: 1. Indicate the type of adjacent foundation, including type of material.

2.The bearing elevation(s) of the adjacent building foundation and its soil classification.

3.For deep foundations, type and location including top and bottom elevations of deep foundation elements.

4.The elevations of all floor levels at grade and below in the adjacent building.

5.Plans, cross-sections, and elevations views as necessary, to illustrate all conditions of the adjacent building relevant to the operation, including the below grade portions and the depth of the proposed excavation.

6.Details and criteria for monitoring the building or wall being supported, including but not limited to criteria and thresholds for movements as specified in Section 1817.9 and Chapters 17 and 33.

7.A fully detailed design of the method of support including any required bracing. 7.1. For pit-pier underpinning, a detailed design for the timber shoring of the pit excavations shall also be provided.

8.A step by step procedure describing the installation of the elements of the method of support. 8.1. For pit-pier underpinning, the procedure shall include a diagram indicating the sequence of the pit installation and a detailed procedure of the installation of the shoring for the pit excavations.

9.The elevation of the water table, need for dewatering as noted in the evaluation report, and the maximum permissible drawdown.

10.References alerting the contractor and the special inspector to review the evaluation report of the adjacent building prior to the start of work.

11.Plans, sections, and elevation views of all methods of support.

12.Soil classification of the required bearing stratum for the elements of the method of support. 12.1. For pit-pier underpinning, also include the required allowable bearing pressure below the pier.

13.A load table or diagram shall be provided to indicate the following: 13.1. Total gravity load in underpinning pier or alternate method of support. 13.2. Total lateral load in underpinning piers or alternate method of support. (Am. L.L. 2023/077, 6/11/2023, eff. 6/11/2023) Editor's note: For related unconsolidated provisions, see Appendix A at L.L. 2023/077.

Common Questions

Our team

Meet the people you will work with

Free case review

Talk to an attorney before you act on NYC code.

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters