1817.4.3 Use of rock support.
BC § 1817.4.3
Existing structures founded at a level above the level of adjacent new construction may be supported on Class 1a, 1b, and 1c rock in lieu of underpinning, provided the requirements of Section 1817.3.4 are satisfied.













