What is NYC BC § 1817.4.2?

Quick Answer

This section outlines the alternative methods of support that may be utilized instead of underpinning during excavation. It specifies that excavation support systems, such as secant piles and slurry walls, can be employed to restrict movements of adjacent buildings within established thresholds. Applies to construction and excavation activities affecting nearby structures.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

1817.4.2 Alternate methods of support.

BC § 1817.4.2

In lieu of underpinning, an excavation support system and/or lateral bracing designed to restrict the movements of the adjacent buildings within the established threshold levels may be installed. Such excavation support systems may consist of secant piles, slurry walls, tangent pile walls, jet grouting, pressed-in continuous sheeting, or similar engineered system.

Common Questions

Our team

Meet the people you will work with

Free case review

Have a matter that touches § 1817.4.2?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters