What is NYC BC § 1814.4.3?

Quick Answer

This section outlines the procedures for verifying the allowable lateral load of a helical pile through load testing as specified in Section 1810.4. After testing, the helical pile must be removed and inspected for deformations to ensure the structural integrity of the shaft and connections. Applies to building owners utilizing helical piles in construction.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

1814.4.3 Lateral load test procedures.

BC § 1814.4.3

The allowable lateral load of a helical pile shall be verified with load testing in accordance with Section 1810.4. Following the lateral load test, the helical pile shall be removed by unscrewing and inspected for any deformations to the helices to verify the structural integrity of the shaft and connections.

Common Questions

Our team

Meet the people you will work with

Free case review

Have a matter that touches § 1814.4.3?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters