What is NYC BC § 1812.7.6?

Quick Answer

This section outlines the requirements for the installation of rock sockets and steel pipes, emphasizing the need for thorough cleaning before filling with concrete or grout. It specifies the positioning of steel cores and restrictions on placing concrete through water without approved methods. Applies to construction professionals involved in foundation work.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

1812.7.6 Installation.

BC § 1812.7.6

The rock socket and steel pipe shall be thoroughly cleaned of foreign materials before filling with concrete or grout. Steel cores shall be set within 6 inches (152.4 mm) above the base of the rock socket. Concrete shall not be placed through water except where a tremie or other method approved by the commissioner is used.

Common Questions

Our team

Meet the people you will work with

Free case review

Talk to an attorney before you act on NYC code.

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters