1812.1.1.2.1 Interval.
BC § 1812.1.1.2.1
Grout samples shall be collected and testing shall be performed for the lesser of the following conditions: 1. each element installed; 2. each batch of site-mixed grout; or 3. each load of ready-mixed grout used.













