Brooklyn since 2014All five boroughsSame-day response during business hours

What is NYC BC § 1811.5.5?

Quick Answer

This section permits the use of lagged or inverted timber piles, detailing requirements for connection and load transfer. It specifies that double lagging must connect adequately to the basic timber pile material, while single lagging should be proportioned for half the load. Applies to building owners utilizing timber piles in construction.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

1811.5.5 Lagged or inverted timber piles.

BC § 1811.5.5

The use of lagged or inverted timber piles is permitted. Double lagging shall be adequately connected to the basic timber pile material to transfer the full load from the basic timber pile material to the lagging without exceeding values of allowable stress as established in Chapter 23. The connection for single lagging shall be proportioned for half the timber pile load. The diameter of any inverted timber pile at any section shall be adequate to resist the applied load without exceeding the stresses specified in Section 1811.5.4, but in no case shall it be less than 8 inches (203.2 mm).

Common Questions

Our team

Meet the people you will work with

Free case review

Have a matter that touches § 1811.5.5?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters