Brooklyn since 2014All five boroughsSame-day response during business hours

What is NYC BC § 1810.4.2.2?

Quick Answer

This section outlines the requirements for uplift load test apparatus and inspections. The design of the apparatus and structure must be conducted by an engineer, and the load tests are to be observed by a special inspector. A complete record of the tests is required to be filed with the commissioner. Applies to building owners conducting uplift load tests.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

1810.4.2.2 Uplift load test apparatus and inspection requirements.

BC § 1810.4.2.2

The apparatus and structure to be used in making the load test shall be designed by an engineer. Load tests shall be performed under the observation of the special inspector. A complete record of such tests shall be filed with the commissioner.

Common Questions

Our team

Meet the people you will work with

Free case review

Have a matter that touches § 1810.4.2.2?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters