Brooklyn since 2014All five boroughsSame-day response during business hours

What is NYC BC § 1810.2.4?

Quick Answer

This section outlines the requirements for pile caps, specifying that they must be made of reinforced concrete and include elements such as grade beams and mats. It details the necessary embedment of deep foundations and frost protection measures. Applies to building owners involved in construction with deep foundations.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

1810.2.4 Pile caps.

BC § 1810.2.4

Pile caps shall be of reinforced concrete, and shall include all elements to which deep foundations are connected, including grade beams and mats. The soil immediately below the pile cap shall not be considered as carrying any vertical load. The tops of deep foundations shall be embedded not fewer than 3 inches (76.2 mm) into pile caps and the caps shall extend at least 4 inches (101.6 mm) beyond the outermost edges of the deep foundation elements. The tops of deep foundations shall be cut back to sound material before capping. Pile caps shall be protected from the effects of frost in accordance with Section 1809.3.1.

Common Questions

Our team

Meet the people you will work with

Free case review

Have a matter that touches § 1810.2.4?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters