What is NYC BC § 1809.5.7.3?

Quick Answer

This section outlines the requirements for the placement of reinforcement in piers prior to concrete placement. It allows for exceptions regarding steel dowels and specifies reduced concrete cover for certain occupancy groups, contingent upon commissioner approval. Applies to building owners engaged in construction activities involving pier reinforcement.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

1809.5.7.3 Reinforcement placement.

BC § 1809.5.7.3

Reinforcement shall be tied and placed as a unit in the pier prior to placement of concrete. Exception: Steel dowels embedded 5 feet (1524 mm) or less in the pier may be placed individually. Reinforcement is permitted to be wet set and the concrete cover that is otherwise required to measure a minimum of 2 1/2 inches (63.5 mm) may be reduced to 2 inches (50.8 mm) for Groups R-3 and U occupancies not exceeding two stories of light-frame construction, provided the construction method is approved by the commissioner.

Common Questions

Our team

Meet the people you will work with

Free case review

Have a matter that touches § 1809.5.7.3?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters