What is NYC BC § 1805.4?

Quick Answer

This section permits the use of a subsoil drainage system to control infiltration or seepage, contingent upon the waterproofing or dampproofing of below ground spaces as specified in Sections 1805.2 and 1805.3. The estimated discharge must also comply with limits set by the relevant agency. Applies to building owners managing subsoil drainage systems.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

1805.4 Subsoil drainage system.

BC § 1805.4

Where it is determined that there is a potential for infiltration or seepage, a subsoil drainage system shall be permitted to be used to control this inflow, provided that: 1. The below ground space is waterproofed or dampproofed per Sections 1805.2 and 1805.3; and 2. The estimated discharge from the drainage system is less than or equal to the amount allowed by the agency having jurisdiction.

Common Questions

Our team

Meet the people you will work with

Free case review

Have a matter that touches § 1805.4?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters