What is NYC BC § 1705.2.3.2?

Quick Answer

This section outlines the requirements for periodic inspection of bolt installation for pretensioning using specified methods such as the turn-of-nut method and direct tension indicator method. It specifies that joints designated as snug tight require only periodic inspection. Applies to building owners responsible for bolt installations in construction.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

1705.2.3.2 Periodic inspection.

BC § 1705.2.3.2

Inspection of bolt installation for pretensioning is permitted to be performed on a periodic basis when using the turn-of-nut method with matchmarking techniques, the direct tension indicator method or the alternate design fastener (twist-off bolt) method. Joints designated as snug tight need be inspected only on a periodic basis.

Common Questions

Our team

Meet the people you will work with

Free case review

Have a matter that touches § 1705.2.3.2?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters