Brooklyn since 2014All five boroughsSame-day response during business hours

What is NYC BC § 1705.2.3?

Quick Answer

This section mandates the inspection of high-strength bolt installations in accordance with specified standards. An exception exists for certain bearing type connections where the connection strength exceeds the required strength, which are inspected under a different section. Applies to building owners involved in construction projects requiring high-strength bolts.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

1705.2.3 High-strength bolts.

BC § 1705.2.3

Installation of high-strength bolts shall be inspected in accordance with this section and AISC 360. Exception: Installation of high strength bolts in bearing type connections where the calculated connection strength is at least twice the required strength of the connection. Inspection of such connections shall be made under Section 1705.2.2. Such connections shall be clearly indicated on the approved construction documents.

Common Questions

Our team

Meet the people you will work with

Free case review

Have a matter that touches § 1705.2.3?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters