What is NYC BC § 1705.16.3?

Quick Answer

This section mandates that a special inspector confirm the installation of thermal barriers in accordance with approved construction documents, manufacturer's instructions, and NFPA 285 assembly design documentation. An exception applies to one-story buildings using foam plastic insulation that do not require compliance with specific thermal barrier standards. Applies to building owners involved in construction projects requiring thermal barriers.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

1705.16.3 Thermal barrier.

BC § 1705.16.3

The special inspector shall confirm the installation of the thermal barrier is in accordance with the approved construction documents, manufacturer's installation instructions, and NFPA 285 tested assembly design documentation. Exception: Foam plastic insulation installation on one-story buildings not required to have thermal barrier complying with Section 2603.4.1.4 of this code.

Common Questions

Our team

Meet the people you will work with

Free case review

Have a matter that touches § 1705.16.3?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters