What is NYC BC § 1607.13.5.1?

Quick Answer

This section mandates that roof structures supporting photovoltaic panel systems must be designed to withstand specified uniform and concentrated roof loads, including the dead loads of the panels. An exception allows for the exclusion of live loads in areas where the space between the panels and the roof surface is 24 inches or less. Applies to building owners installing photovoltaic systems on roofs.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

1607.13.5.1 Roof live load.

BC § 1607.13.5.1

Roof structures that support photovoltaic panel systems shall be designed to resist each of the following conditions: 1. Applicable uniform and concentrated roof loads with the photovoltaic panel system dead loads. Exception: Roof live loads need not be applied to the area covered by photovoltaic panels where the clear space between the panels and the roof surface is 24 inches (609.6 mm) or less.

2.Applicable uniform and concentrated roof loads without the photovoltaic panel system present.

Common Questions

Our team

Meet the people you will work with

Free case review

Have a matter that touches § 1607.13.5.1?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters