Brooklyn since 2014All five boroughsSame-day response during business hours

What is NYC BC § 1409.11?

Quick Answer

This section mandates that all High-Pressure Laminate (HPL) systems undergo full-scale testing in accordance with NFPA 285 acceptance criteria. Testing must include HPL in both minimum and maximum thicknesses, and any deviations from the approved design require approval from a registered design professional. Applies to building owners utilizing HPL systems in construction.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

1409.11 Full-scale tests.

BC § 1409.11

All HPL systems shall be tested in accordance with, and comply with, the acceptance criteria of NFPA 285. Such testing shall be performed on the HPL system with the HPL in the minimum and maximum thicknesses intended for use, including any required fireblocking. Approved NFPA 285 tested assembly design documentation of the HPL system shall be included on the submitted construction documents complying with Section 1401.2 of this code. Deviation from the NFPA 285 tested design shall be approved by the registered design professional and additional documentation shall be provided if requested by the department.

Common Questions

Our team

Meet the people you will work with

Free case review

Have a matter that touches § 1409.11?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters