What is NYC BC § 1405.10.1.3?

Quick Answer

This section specifies the required clearances for adhered masonry veneer on exterior stud walls, stating that it must be installed at least 4 inches above earth, 2 inches above paved areas, or 1/2 inch above supported walking surfaces. Applies to building owners involved in construction or renovation projects.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

1405.10.1.3 Clearances.

BC § 1405.10.1.3

On exterior stud walls, adhered masonry veneer shall be installed not less than 4 inches (101.6 mm) above the earth, or not less than 2 inches (50.8 mm) above paved areas, or not less than 1/2 inch (12.7 mm) above exterior walking surfaces that are supported by the same foundation that supports the exterior wall.

Common Questions

Our team

Meet the people you will work with

Free case review

Have a matter that touches § 1405.10.1.3?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters