Brooklyn since 2014All five boroughsSame-day response during business hours

What is NYC BC § 107.7?

Quick Answer

This section outlines the requirements for structural plans, including the necessary data and information to be provided. It specifies conditions for deferred submittal of shop or working drawings and the use of manufacturer's catalogues for structural detailing. Applies to building owners preparing structural plans for construction projects.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

107.7 Structural plans.

BC § 107.7

Structural plans shall include the data and information described in this section and in Chapter 16. Structural calculations shall be made available to the department upon request. Exceptions: 1. Where structural elements are normally detailed on shop or working drawings, approval of construction documents shall be conditioned upon deferred submittal of such shop or working drawings showing the approval of the registered design professional who prepared the structural construction documents, or of a signed statement by such registered design professional that such drawings were prepared to his or her satisfaction.

2.In cases where the detailing of structural elements has been made on the basis of fire-resistance ratings, load tables, or similar data as given in manufacturer's catalogues, approval of construction documents shall be conditional upon submission of a manufacturer's designation attesting to the accuracy of the data and indicating that such data were derived in conformance with the provisions of this code. Where the detailing of structural elements has been made on the basis of data published in technical documents of recognized authority issued or accredited by the agency or association promulgating the applicable referenced standard, such manufacturer's designation will not be required.

Common Questions

Our team

Meet the people you will work with

Free case review

Have a matter that touches § 107.7?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters