What is NYC BC § 107.18.1?

Quick Answer

This section mandates the inclusion of a chimney and vent plan in construction documents at the time of initial filing. The plan must detail the location, specifications, and any required alterations of chimneys and vents within 100 feet of the construction site. Applies to building owners engaged in construction projects.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

107.18.1 Chimney and vent plan.

BC § 107.18.1

At the time of initial filing for construction, a chimney and vent plan shall be included as part of the construction documents. Such chimney and vent plan shall include the following information for all chimneys and vents within 100 feet (30 480 mm) of construction: 1. A drawing identifying the location of each existing chimney and vent.

2.A chimney and vent schedule containing the following information for each chimney and vent: 2.1. The cross-sectional area of the chimney or vent outlet. 2.2. The horizontal distance measured from the adjacent construction to the outlet 2.3. The elevation of the outlet. 2.4. The appliance, mechanical system, or fireplace to which the chimney or vent is attached, including the flue gas temperature, or a notation that this information is not yet known. 2.5. If extension, alteration, or relocation is required and describing the expected work.

3.Calculations demonstrating which chimneys and vents require no alteration based on the termination requirements including but not limited to those found in Section 503.5.4 of the New York City Fuel Gas Code and Section 801.20 of the New York City Mechanical Code.

Common Questions

Our team

Meet the people you will work with

Free case review

Have a matter that touches § 107.18.1?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters