What is NYC RCNY § 4-03?

Quick Answer

(a) Prohibitions and requirements. (1) No person shall transfer or allow the transfer of gasoline into storage tanks at gasoline dispensing sites located in New York City whose annual throughput exceeds 120,000 gallons, unless the storage tank is equipped with: (i) A stage 1 vapor collection system consisting of a vap

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

§ 4-03 Gasoline Dispensing Sites.

RCNY § 4-03

(a)Prohibitions and requirements.

(1)No person shall transfer or allow the transfer of gasoline into storage tanks at gasoline dispensing sites located in New York City whose annual throughput exceeds 120,000 gallons, unless the storage tank is equipped with: (i) A stage 1 vapor collection system consisting of a vapor-tight return line from the storage tank, or its vent, to the gasoline transport vehicle and a system that will ensure that the vapor line is connected before gasoline can be transferred into the tank; or (ii) A properly installed on-site vapor control system connected to a vapor collection system; or (iii) An equivalent control system approved by the Commissioner.

(2)Owners and/or operators of gasoline storage tanks subject to stage 1 vapor collection or vapor control system requirements shall: (i) Install all required stage 1 vapor collection and control systems, and make any modifications necessary to comply with the requirements; (ii) Provide adequate training and written instructions to the operator(s) of the affected gasoline dispensing site; (iii) Replace, repair, or modify any worn or ineffective component or design element to ensure the vapor-tight integrity and efficiency of the stage 1 vapor collection and vapor control systems; and (iv) Connect and properly operate the stage 1 vapor collection and control systems whenever gasoline is being loaded or unloaded.

(3)Each stationary storage tank with a capacity of at least 250 gallons installed or modified after January 1, 1979 at any gasoline dispensing site in New York City area shall have a stage 1 vapor collection or vapor control system.

(4)No person shall install, alter, test or repair underground equipment for storage, underground storage systems, underground tanks and underground piping and valves for gasoline except by or under direct supervision of a person who has first secured from the Commissioner of the Fire Department of the City of New York a Certificate of License to make such installation, alteration, test or repair. A written application for alteration to any part of existing underground equipment and/or underground storage systems shall be made to the Fire Department according to the requirements of § 27-4062(d) of the Administrative Code of the City of New York.

(b)Certificate of Registration. Owners and/or operators of gasoline dispensing sites who are required to comply under 15 RCNY § 4-03(a) shall apply for a Certificate of Registration and pay a fee for each registration or renewal thereof according to § 24-140(c) of the New York City Administrative Code within 10 days of the effective date of this regulation.

(c)Exemptions.

Common Questions

Our team

Meet the people you will work with

Free case review

Talk to an attorney before you act on NYC code.

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters