Brooklyn since 2014All five boroughsSame-day response during business hours

What is NYC RCNY § 25-09?

Quick Answer

(a) Where a plumbing repair slip has been filed it shall be the responsibility of the inspectors of plumbing to see that gas-fueled space and water heaters are installed in dwellings, apartments and rooms where such heaters are permitted to be installed in lieu of central heat or supply of hot water. They shall see to

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

§ 25-09 Inspection of Gas-Fueled Space and Water Heaters.

RCNY § 25-09

(a)Where a plumbing repair slip has been filed it shall be the responsibility of the inspectors of plumbing to see that gas-fueled space and water heaters are installed in dwellings, apartments and rooms where such heaters are permitted to be installed in lieu of central heat or supply of hot water. They shall see to it that the appliances are of types approved by the Department of Health and the American Gas Association, and are installed in compliance with these rules. Inspectors shall require the filing of a building notice where an appliance is to be placed in sleeping room where vent pipes are to be installed, or other work done.

(b)A building notice covering the installation of these appliances in dwellings shall be forwarded directly to the plumbing inspectors when approved as a permit. The installation of such appliances including Type B and other gas vents, but not chimneys, shall be inspected by inspectors of plumbing. If a building notice application does not call for construction of a masonry or metal chimney, it shall be reported as completed, by the plumbing inspector, provided the work was satisfactory with a note on his report "no structural work".

(c)If the building notice calls for the erection of a masonry or metal chimney, it shall be forwarded by the plumbing inspector to the construction inspector as soon as the plumbing inspector has found the installation of these gas appliances and vent connections satisfactory. The construction inspector shall report such an application completed if the construction of the chimney has been satisfactorily performed

Common Questions

Our team

Meet the people you will work with

Free case review

Have a matter that touches § 25-09?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters