§ 1-92 — Work Place Entry and Exit Procedures.

Brooklyn since 2014All five boroughsSame-day response during business hours

What is NYC RCNY § 1-92?

Quick Answer

The following procedures shall be followed during the conduct of abatement activities on asbestos projects: (a) Entrance procedures. (1) All workers and authorized visitors shall enter the work area through the worker decontamination enclosure system.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →
Effective: 1/6/2019Last amended: 5/28/2022

§ 1-92 Work Place Entry and Exit Procedures.

RCNY § 1-92

The following procedures shall be followed during the conduct of abatement activities on asbestos projects: (a) Entrance procedures.

(1)All workers and authorized visitors shall enter the work area through the worker decontamination enclosure system.

(2)All individuals who enter the work area shall sign the abatement contractor's log located in the clean room, upon each entry and exit. The abatement contractor's log shall be permanently bound and at a minimum shall identify fully the building owner, agents, contractor(s), the project, each work area and worker respiratory protection employed, and other pertinent information including daily activities, cleanings and waste transfers, names and certificate numbers of asbestos handler supervisors and asbestos handlers; results of inspections of decontamination systems, barriers, and negative pressure ventilation equipment; summary of corrective actions and repairs; work stoppages with reason for stoppage; manometer readings at least twice per work shift; daily checks of emergency and fire exits and any unusual events. The abatement contractor's log shall be available for examination during abatement activities by the Department, the owner and the workers. A copy of the abatement contractor's log shall be submitted directly to the Department within 72 hours of request.

(3)All individuals before entering the work area shall be familiar with all posted regulations, personal protection requirements and emergency procedures. The abatement contractor's log headings shall indicate, and the signatures shall be used to acknowledge, that the regulations and procedures have been reviewed and understood by all persons prior to entering the work area. The postings and abatement contractor's log headings shall be in English and in the language of the majority of the asbestos handlers.

(4)All individuals shall proceed first to the clean room, remove all street clothing, store these items in clean sealable plastic bags or a locker and don personal protective equipment. Clean personal protective equipment shall be provided by the abatement contractor and utilized by each individual for each separate entry into the work area.

(b)Exit procedures.

(c)When abatement activities are located in a confined space the contractor must comply with all the requirements set forth in OSHA 29 C.F.R. 1910.146.and 1926.21(a) and (b). (Amended City Record 12/7/2018, eff. 1/6/2019; amended City Record 4/28/2022, eff. 5/28/2022)

Common Questions

Our team

Meet the people you will work with

Free case review

Talk to an attorney before you act on NYC code.

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters