What is NYC RCNY § 1-112?

Quick Answer

Additional clean-up procedures shall be performed in the order set forth below prior to commencement of clearance air monitoring. (a) After removal of visible accumulations of asbestos-containing waste material, all surfaces must be HEPA vacuumed.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →
Effective: 1/6/2019Last amended: 2/14/2025

§ 1-112 Additional Clean-up Procedures (Final).

RCNY § 1-112

Additional clean-up procedures shall be performed in the order set forth below prior to commencement of clearance air monitoring.

(a)After removal of visible accumulations of asbestos-containing waste material, all surfaces must be HEPA vacuumed. To pick up excess water and saturated debris, a wet-dry shop HEPA vacuum, dedicated to asbestos abatement, may be used.

(b)All surfaces in the work area shall be wet cleaned (first cleaning).

(c)A thin coat of lockdown encapsulant shall be applied to all surfaces in the work area which were not the subject of removal or abatement, including the cleaned layer of the surface barriers and excluding sprinklers, standpipes, and other active elements of the fire suppression system.

(d)After the first cleaning, the work area shall be vacated for 12 hours to allow fibers to settle.

(e)The cleaned and encapsulated layer of the surface barriers shall be removed from the walls and floors.

(f)All objects and surfaces in the work area shall be HEPA vacuumed and wet cleaned a second time.

(g)After the second cleaning, the work area shall be vacated for 4 hours before wet cleaning and/or HEPA vacuuming all surfaces in the work area for a third cleaning.

(h)After the plastic barriers on the walls and floors have been removed, a third cleaning shall be performed of all surfaces in the work area by wet cleaning and/or HEPA vacuuming. A minimum of a one hour waiting period shall be conducted to allow the work area to dry prior to the visual inspection by the air monitor and asbestos supervisor.

(i)Before starting clearance air monitoring, a thorough visual inspection must be conducted to verify the absence of asbestos-containing waste material (e.g. dust). This inspection must be documented in the project air sampling log.

(j)All containerized waste shall be removed from the work area through the decontamination enclosures and the holding area.

(k)All tools and equipment shall be removed from the work area and decontaminated in the waste decontamination enclosure system. Cloths, mops, and other cleaning aids shall be disposed of as asbestos-containing waste material.

(l)After successful clearance air monitoring (see 15 RCNY §§ 1-31 et seq.), the isolation barriers shall be removed and the remaining worker and waste decontamination enclosure(s) must be dismantled and removed from the work site. All plastic sheeting must be cleaned using a HEPA vacuum and disposed of as asbestos contaminated waste.

(m)Within 21 days of the completion of all steps set forth above, including successful clearance air monitoring, a project monitor’s report (Form ACP15) must be submitted to DEP. Failure to submit the ACP15 Form will result in suspension of the air monitor’s account and the contractor’s account in the ARTS E-File System until the form is submitted. This report must be based on an inspection performed after the completion of all steps listed in this section, and may not be based on the visual inspection performed prior to the commencement of clearance air monitoring. This inspection must be documented in the project air sampling log. The project monitor who prepares the report must be independent of the abatement contractor. If a project is being performed on multiple floors of a building, a separate project monitor’s report may be submitted as each floor is completed. Compliance with this subdivision is the responsibility of the building owner. (Amended City Record 12/7/2018, eff. 1/6/2019 amended City Record 4/28/2022, eff. 5/28/2022; amended City Record 1/15/2025, eff. 2/14/2025)

Common Questions

Our team

Meet the people you will work with

Free case review

Have a matter that touches § 1-112?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters